Deliverables, milestones and workshops 2007
List of WP8 deliverables during the first period
|
Del. no. |
Deliverable name |
WP no. |
Date due |
Actual/Forecast delivery date |
Used indicative person-months |
Lead contractor |
|
D8.1-1 |
Report on detailed conceptual specification for medium range localization/navigation module and technical specification |
8.1 |
Month 8 |
Month 11 |
3 |
HUT |
|
D8.1-2 |
Preliminary test report for testing onboard a float/glider |
8.1 |
Month 10 |
Month 12 |
6 |
ENSIETA |
|
D8.1-3 |
Standards and protocols and reporting for long range navigation low frequency systems |
8.1 |
Month 3 |
Included into D8.1-1 |
0 |
IFREMER |
|
D8.1-4 |
Standards and protocols and reporting for short range communication high frequency systems |
8.1 |
Month 3 |
Month 6 |
5 |
ATL |
|
D8.1-5 |
Standards and protocols and reporting for satellite telecommunications and near real time data transfer |
8.1 |
Month 3 |
Month 6 |
0.5 |
IPEV |
|
D8.2-1 |
Conceptual design and preliminary specifications of the streaming-mode tomographic analysis system |
8.2 |
Month 12 |
Month 12 |
5.3 |
FORTH |
|
D8.3-1 |
Report on technical evaluation of the ITPs subsystems selected for DAMOCLES |
8.3 |
Month 3 |
Month 5 |
0.05 |
UPMC |
|
D8.3-2 |
Report on technical evaluation of the bottom moored systems selected for DAMOCLES |
8.3 |
Month 12 |
Month 12 |
2 |
AWI |
|
D8.3-3 |
Report on technical evaluation of floats equipped with ULS |
8.3 |
Month 12 |
Month 12 |
5 |
MSI |
|
D8.3-4 |
Report on technical evaluation of sea gliders under sea-ice |
8.3 |
Month 12 |
Month 12 |
10 |
ENSIETA |
|
D8.4-1 |
Logistics framework plan with tentative time and operator schedules |
8.4 |
Month 3 |
Month 6 |
1 |
DNSC |
|
D8.4-2 |
Contracts and/or formal agreements with aircraft operators, ship operators and ice platform providers for 2006 |
8.4 |
Month 3 |
Month 10 |
2 |
UPMC |
|
D8.4-3 |
Detailed time plan and fuel arrangements for airborne activities for 2006 |
8.4 |
Month 3 |
Month 14 |
1 |
CPX |
|
D8.4-4 |
Schedule of arrangements for transport and lodging of individual participants, airfreight of equipment to primary departure bases |
8.4 |
Month 3 |
Month 5 |
0 |
SRC AARI |
|
D8.4-5 |
Report of 2006 deployment of ITPs, buoys, etc. during Dranitsyn NABOS |
8.4 |
Month 12 |
Month 12 |
3 |
UPMC |
List of WP8 milestones during the first period
|
Milestone no. |
Milestone name |
WP no. |
Date due |
Actual/Forecast delivery date |
Lead contractor |
|
M8.1-1 |
Workshop on acoustic navigation and communication in Arctic Ocean Observing Systems (definition of specifications for DAMOCLES AOOS Array) |
8.1 |
Month 1 |
Month 05 |
IPEV, HUT |
|
M8.1-2 |
Public calls |
8.1 |
Month 1 |
Month 5 |
IPEV, HUT |
|
M8.1-3 |
Deadline for public call. Submission and selection. Start of ordering equipments |
8.1 |
Month 2 |
Month 6 |
IPEV, HUT |
|
M8.1-4 |
Workshop Arctic instrumentation in Brest |
8.1 |
Month 6 |
Month 7 |
IPEV, HUT |
|
M8.1-5 |
Definition of an operational LF acoustic navigation system adapted to an ice covered ocean |
8.1 |
Month 10 |
Month 11 |
IPEV, HUT |
|
M8.1-6 |
Definition of an operational HF acoustic communication and data transfer under sea-ice |
8.1 |
Month 10 |
Month 11 |
IPEV, HUT |
|
M8.1-7 |
Definition of an operational satellite telecommunications system adapted to the Arctic Ocean |
8.1 |
Month 11 |
Month 11 |
IPEV, HUT |
|
M8.1-8 |
First equipment delivery for DAMOCLES |
8.1 |
Month 6 |
Month 10 |
IPEV, HUT |
|
M8.3-1 |
First test in Svalbard area (Storfjord) of ULS mounted on floats |
8.3 |
Month 4 |
Month 18 |
AWI, UPMC |
|
M8.3-2 |
Deployment of bottom moorings along the continental margin north of Svalbard with the Norwegian ship Lance and north of Svernaya Zemlya with Russian ice breaker Kapitan Dranytsin in cooperation with NABOS |
8.3 |
Month 9 |
Month 10 |
AWI, UPMC |
|
M8.3-3 |
First deployment of ITPs in the transpolar drift |
8.3 |
Month 10 |
Month 10 |
AWI, UPMC |
|
M8.4-1 |
Logistics Master Plan (ship and air logistics) |
8.4 |
Month 3 |
Month 6 |
DNSC, AARI |
|
M8.4-2 |
Formal agreement with logistical partners and subcontractors and third parties |
8.4 |
Month 3 |
Month 10 |
DNSC, AARI |
|
M8.4-3 |
First airborne deployment of buoys |
8.4 |
Month 9 |
Month 10 |
DNSC, AARI |
List of WP8 workshops during the first period
· WP8 Workshop: Acoustic Communications & Navigation, 21 February 2006, Farnham, England.
· High Tech Instrumentation Training Course, 20-21 June 2006, Brest, France.