List of WP8 deliverables during the first period

Del. no.

Deliverable name

WP no.

Date due

Actual/Forecast delivery date

Used indicative person-months

Lead contractor

D8.1-1

Report on detailed conceptual specification for medium range localization/navigation module and technical specification

8.1

Month 8

Month 11

3

HUT

D8.1-2

Preliminary test report for testing onboard a float/glider

8.1

Month 10

Month 12

6

ENSIETA

D8.1-3

Standards and protocols and reporting for long range navigation low frequency systems

8.1

Month 3

Included into D8.1-1

0

IFREMER

D8.1-4

Standards and protocols and reporting for short range communication high frequency systems

8.1

Month 3

Month 6

5

ATL

D8.1-5

Standards and protocols and reporting for satellite telecommunications and near real time data transfer

8.1

Month 3

Month 6

0.5

IPEV

D8.2-1

Conceptual design and preliminary specifications of the streaming-mode tomographic analysis system

8.2

Month 12

Month 12

5.3

FORTH

D8.3-1

Report on technical evaluation of the ITPs subsystems selected for DAMOCLES

8.3

Month 3

Month 5

0.05

UPMC

D8.3-2

Report on technical evaluation of the bottom moored systems selected for DAMOCLES

8.3

Month 12

Month 12

2

AWI

D8.3-3

Report on technical evaluation of floats equipped with ULS

8.3

Month 12

Month 12

5

MSI

D8.3-4

Report on technical evaluation of sea gliders under sea-ice

8.3

Month 12

Month 12

10

ENSIETA

D8.4-1

Logistics framework plan with tentative time and operator schedules

8.4

Month 3

Month 6

1

DNSC

D8.4-2

Contracts and/or formal agreements with aircraft operators, ship operators and ice platform providers for 2006

8.4

Month 3

Month 10

2

UPMC

D8.4-3

Detailed time plan and fuel arrangements for airborne activities for 2006

8.4

Month 3

Month 14

1

CPX

D8.4-4

Schedule of arrangements for transport and lodging of individual participants, airfreight of equipment to primary departure bases

8.4

Month 3

Month 5

0

SRC AARI

D8.4-5

Report of 2006 deployment of ITPs, buoys, etc. during Dranitsyn NABOS

8.4

Month 12

Month 12

3

UPMC

 

List of WP8 milestones during the first period

Milestone

no.

Milestone name

WP no.

Date due

Actual/Forecast delivery date

Lead contractor

M8.1-1

Workshop on acoustic navigation and communication in Arctic Ocean Observing Systems (definition of specifications for DAMOCLES AOOS Array)

8.1

Month 1

Month 05

IPEV, HUT

M8.1-2

Public calls

8.1

Month 1

Month 5

IPEV, HUT

M8.1-3

Deadline for public call. Submission and selection. Start of ordering equipments

8.1

Month 2

Month 6

IPEV, HUT

M8.1-4

Workshop Arctic instrumentation in Brest

8.1

Month 6

Month 7

IPEV, HUT

M8.1-5

Definition of an operational LF acoustic navigation system adapted to an ice covered ocean

8.1

Month 10

Month 11

IPEV, HUT

M8.1-6

Definition of an operational HF acoustic communication and data transfer under sea-ice

8.1

Month 10

Month 11

IPEV, HUT

M8.1-7

Definition of an operational satellite telecommunications system adapted to the Arctic Ocean

8.1

Month 11

Month 11

IPEV, HUT

M8.1-8

First equipment delivery for DAMOCLES

8.1

Month 6

Month 10

IPEV, HUT

M8.3-1

First test in Svalbard area (Storfjord) of ULS mounted on floats

8.3

Month 4

Month 18

AWI, UPMC

M8.3-2

Deployment of bottom moorings along the continental margin north of Svalbard with the Norwegian ship Lance and north of Svernaya Zemlya with Russian ice breaker Kapitan Dranytsin in cooperation with NABOS

8.3

Month 9

Month 10

AWI, UPMC

M8.3-3

First deployment of ITPs in the transpolar drift

8.3

Month 10

Month 10

AWI, UPMC

M8.4-1

Logistics Master Plan (ship and air logistics)

8.4

Month 3

Month 6

DNSC, AARI

M8.4-2

Formal agreement with logistical partners and subcontractors and third parties

8.4

Month 3

Month 10

DNSC, AARI

M8.4-3

First airborne deployment of buoys

8.4

Month 9

Month 10

DNSC, AARI

 

List of WP8 workshops during the first period

· WP8 Workshop: Acoustic Communications & Navigation, 21 February 2006, Farnham, England.

· High Tech Instrumentation Training Course, 20-21 June 2006, Brest, France.

Mar 5, 2007
Nov 10, 2008

Developing Arctic Modeling and Observing Capabilities for Long-term Environmental Studies